Skip to content
Less than 1 minute Minutes

2026 Business Broadband Refresh Checklist. Why Now? Why 2026?

Several factors indicate it’s the right time to refresh your 2026 Business Broadband: FTTC switch-off is January 2027 (migration must happen in 2026), PSTN switch-off is January 2027 (VoIP migration needed in 2026), many business contracts signed in 2021 or 2022 are coming up for renewal, mid-contract price increases are happening (covered earlier) – renewal is an opportunity to lock in fixed pricing, technology has advanced significantly since 2021, and remote working and hybrid work are now standard – connectivity needs have shifted.

2026 is a window year where multiple factors align: industry change, contract renewal timing, and evolving business needs. It’s the right time to assess and refresh.

Part 1: Audit Your Current Setup

1. Identify Your Current Technology

What broadband are you currently on? FTTC (fibre to the cabinet)? If so, migration is urgent – you must move before January 2027. SOGEA? If so, you’re on a newer standard but might benefit from FTTP if available. FTTP (full fibre)? Good – you’re on modern infrastructure. Leased line (dedicated)? Excellent – highest reliability. LTE/4G/5G mobile backup? Check if it’s genuinely backup or if it’s your primary connection.

Call your ISP if you’re unsure. They can confirm your current technology in seconds.

2. Measure Your Actual Speed and Performance

Run speed tests during different times of day. Use Speedtest.net to measure download speed (peak vs off-peak), upload speed (critical if you work in video, creative, or cloud-intensive fields), latency/ping (measures responsiveness), and jitter (variance in latency – important for VoIP).

Note variations between times of day. Network congestion affects performance. Consistency matters.

3. Identify Your Uptime and Downtime History

Have you experienced outages in the past 12 months? How many outages did you have? How long did each last? What was the business impact? How quickly was each resolved?

Track this information. It’s valuable when evaluating whether an upgrade is needed.

4. Review Your Current Contract

Pull out your broadband contract and review: What’s the current speed tier and pricing? When does the contract expire? What’s the uptime SLA (if any)? Are there price increase clauses? (covered earlier – these are a problem) What’s the exit penalty if you want to leave? Is support included or extra?

Understanding your current contract terms is essential for comparing alternatives.

5. Document Your Current Provider and Support Quality

How satisfied are you with your current provider? When you’ve called support, how quickly did they respond? Did they resolve issues satisfactorily? Have you had issues reaching support? Do you have a named account manager, or is it anonymous support?

Support quality matters as much as speed. Poor support makes good broadband frustrating.

Part 2: Assess Your Business Needs

6. Document Your Actual Bandwidth Requirements

How much bandwidth does your business actually use? Track usage for a week: Peak hours: What’s your typical peak-time usage? Off-peak hours: What’s baseline usage? Critical operations: Which systems need the most bandwidth? Number of simultaneous users: How many people are online at once? Cloud usage: Do you use Microsoft 365, Salesforce, Google Workspace, or other cloud-heavy systems? Video conferencing: How much daily video calling do you do?

Modern businesses often underestimate bandwidth needs. Cloud systems, video calls, and remote working all consume significant bandwidth.

7. Identify Single Points of Failure

What happens if your broadband fails? Do you have backup connectivity? (Mobile backup, secondary line, etc.) Can your systems operate offline temporarily? How long can you survive without connectivity? Is downtime acceptable or disastrous?

For mission-critical operations, backup connectivity should be standard, not optional.

8. Assess Your Remote Work Connectivity Needs

Has remote work changed since your broadband was installed? What percentage of your team works remotely? Do remote workers need to access office systems constantly? Are they using VPNs, direct cloud access, or other remote access methods? Are they using WiFi-only, or do they have hardwired connections?

Remote work means your broadband needs to support distributed teams, not just office-based workers.

9. Evaluate Your Upload Requirements

This is often overlooked. Upload speed matters for cloud backups and sync services, video conferencing and streaming, large file transfers, and creative work (video, design, photography).

If you’re regularly uploading large files or doing video-heavy work, weak upload speed is a productivity bottleneck.

Part 3: Evaluate Upgrade Options

10. Check What Technology Is Available at Your Address

Visit Openreach’s coverage checker or call providers: Is FTTP available? If yes, this is worth serious consideration. Is SOGEA available? (Important if you’re on FTTC) Is a dedicated leased line available? Are there any alternative providers in your area?

Availability varies dramatically by location. Some businesses have multiple options. Others have limited choices. Know what’s available before making decisions.

11. Compare Providers and Pricing

Get quotes from at least 3 providers if available. Compare speed tiers and actual guaranteed speeds, uptime SLA, support response time, monthly cost and any one-time setup fees, contract length and exit penalties, whether pricing is fixed or subject to increases.

Don’t just compare headline prices. Calculate true cost, including support quality, uptime reliability, and risk of mid-contract increases.

12. Plan Your FTTC and PSTN Migration (If Applicable)

If you’re on FTTC or legacy phone services: You must migrate by January 2027, plan the migration for mid-2026 to avoid a rush closer to the deadline, evaluate SOGEA vs FTTP for your needs, if you have old phone systems, evaluate VoIP migration as well, and schedule migrations during quiet business periods.

These are not optional. Plan now to have control over the process rather than dealing with forced migration later.

Part 4: Make Your Refresh Decision

Upgrade, Refresh, or Maintain?

Based on your audit and assessment, you have three options:

Option A: Upgrade to Better Technology

If FTTP is available and you’re currently on FTTC or SOGEA, upgrading is worth considering. You get higher speeds, better reliability, and future-proofed infrastructure.

Upgrade if: You’re on FTTC (mandatory by January 2027 anyway), you regularly experience congestion or slowdowns, your current technology is limiting your business operations, you have remote workers struggling with connectivity.

Option B: Refresh with Better Terms

If your current technology is adequate but your contract has poor terms (price increases, weak SLA, poor support), refresh with a better provider or better contract terms.

Refresh if: Your current speeds are adequate, but contract terms are bad, you have mid-contract price increase clauses, your support experience is poor, or your contract is coming up for renewal.

Option C: Maintain Current Setup

If your current setup is working well and you’re not on FTTC, you might maintain your current provider and technology.

Maintain only if: You’re not on FTTC, your speeds meet current and foreseeable needs, your contract has reasonable terms (fixed pricing, acceptable SLA), and you’re satisfied with your provider’s support.

Even if maintaining, review your contract when it comes up for renewal. Negotiate better terms if possible.

Action Plan

After completing this checklist, create an action plan: Document all findings from the audit and assessment, decide: upgrade, refresh, or maintain?, if upgrading or refreshing: get quotes from multiple providers, if FTTC or PSTN migration needed: schedule for mid-2026, set budget for any changes and get approval from management, schedule implementation during a quiet business period, plan cutover with minimal downtime (typically 1-2 hours), test thoroughly after cutover, and document new setup for future reference.

What Multidata Recommends

Every business should conduct a business connectivity assessment in 2026. Use this checklist as your guide. A professional broadband audit takes the guesswork out of decisions. Regular review ensures your broadband remains fit for purpose.

Contact Multidata to conduct a formal broadband audit. We can assess your current setup and performance, identify what technologies are available at your address, compare options and pricing, help plan any necessary migrations, and manage the cutover to minimise downtime. We can often identify optimisations that pay for the assessment through reduced costs or improved performance.

Don’t let 2026 pass without auditing your broadband. The decisions you make now will determine your connectivity for the next 3-5 years.

Don’t let 2026 pass without auditing your broadband. The decisions you make now will determine your connectivity for the next 3-5 years. Creating your refresh timeline is essential. March-April: Complete audit and send out RFQs. May-June: Evaluate proposals and make a decision. July-August: Finalise contracts. September-October: Conduct migrations. November-December: Complete all migrations before year-end.

This timeline ensures completion before the January 2027 FTTC switch-off. For additional resources on broadband technology choices and refresh planning, Ofcom publishes detailed guidance on broadband options available across the UK.

Frequently Asked Questions

  • Is upgrading from FTTC to FTTP worth the extra cost?

    If FTTP is available, yes. Higher speeds, better reliability, and future-proofed infrastructure are worth the modest cost difference. Plan for the upgrade in 2026 rather than being forced to migrate in January 2027.

Table of Contents